Home › How It Works

The Process, Start to Finish

How BINSR repairs work
in Arizona.

Three simple steps: upload the BINSR, get a complete itemized quote with a 36-calendar-hour target, and we complete the work while you pay at close. Every trade, paint and drywall included — built around the Arizona closing clock so the deal keeps moving.

✓ Licensed Arizona GC · ROC #356246 ✓ 36-hour quote target ✓ Pay at close ✓ No quote fees
⏱ The seller has just 5 days to respond to the BINSR. We quote with a 36-calendar-hour target — so you stay ahead of the clock.

The Three Steps

From inspection report to done

No forms to fill out, no vendors to chase. You send the BINSR, we handle everything else.

1

Upload the BINSR & report

Send us the BINSR along with the inspection report or photos. Use whatever you already have:

  • Spectora inspection link
  • Inspection report PDF
  • Photos or images
2

Get a complete quote with a 36-calendar-hour target

We return a complete, itemized estimate covering the entire list with a 36-calendar-hour target:

  • Every trade included
  • Paint & drywall included
  • No quote fees, ever
3

We complete the work, you pay at close

Licensed crews finish on schedule, then the seller settles up at closing:

  • Pay at close may be available on qualifying jobs
  • Done before the close date
  • Lender- & title-ready docs

The Arizona BINSR Timeline

Where we fit in the closing clock

Under the standard AAR Residential Resale contract, the inspection and BINSR run on a tight schedule. Here's the typical sequence — and why a 36-hour quote matters.

10 daysInspection

Inspection period

After contract acceptance, the buyer typically has 10 days to inspect the home and investigate any concerns before delivering the BINSR.

36 hrsOur quote

You send us the BINSR — we quote with a 36-calendar-hour target

The moment the BINSR lands, hand it to us. We return a complete, itemized quote with a 36-calendar-hour target — well inside the seller's response window.

5 daysSeller response

Seller response deadline

The seller has 5 days to respond to the BINSR — agree to repairs, decline, or negotiate. Our fast, complete quote gives them a real number to respond with, not a guess.

5 daysBuyer decision

Buyer decision period

After the seller responds, the buyer has 5 days to decide whether to proceed. Clean, complete repair pricing keeps everyone confident and the deal on track to close.

Timeframes reflect the standard AAR contract and can vary by agreement. Always confirm the exact deadlines in your specific contract.

What You Get

One coordinated quote, with exceptions made clear

Everything that makes the BINSR the easiest step in the transaction.

  • A complete, itemized quote with a 36-calendar-hour target — the entire BINSR, not the easy half.
  • Every trade, paint and drywall included — never "priced separately," never a surprise.
  • Pay at close may be available on qualifying jobs. Subject to escrow, lender, title, and all-party approval.
  • No current quote fee — BINSR Builders currently provides quotes without a quote fee.
  • One licensed GC & Realtor founder — one point of contact, from quote to keys.
  • Transaction-review documentation — itemized materials prepared for lender, title, and escrow review; acceptance depends on the transaction.
Our Guarantee

Our 36-Hour Quote Target

Our target is a complete, itemized quote within 36 calendar hours after we receive the information needed to price the work, including the BINSR, inspection report, photos, and any required access details. Evenings and weekends count. Site visits or specialist review may require more time; we will communicate any revised timing. This is a target, not a guarantee. We close deals, not kill them.

FAQ

How the process works, answered

How do I send you the BINSR and inspection report?

Email or text us the BINSR with the inspection report or photos. We accept a Spectora link, a PDF, or images — whatever you already have. There's nothing for you to fill out or format.

How fast will I get the quote?

with a 36-calendar-hour target after receiving a complete BINSR and inspection photos, we return a complete, itemized quote — built to fit Arizona's 5-day seller-response deadline.

Does the quote include every item, paint and drywall too?

Yes. Because we're a licensed Arizona general contractor, we coordinate the approved scope, with licensed work performed by Prolific Builders LLC, and include paint, drywall, and texture — never left off as "priced separately." One complete number for the whole list.

When and how does the seller pay?

Pay-at-close billing may be available on qualifying jobs, subject to escrow, lender, title, and all-party approval. It is not available on every job.

Will the repairs be done before closing?

Work is scheduled around the transaction timeline, but completion dates depend on the approved scope, access, materials, permits, and trade availability. Timing is confirmed for each job.

What is the Arizona BINSR timeline?

Under the standard AAR contract, the buyer has a 10-day inspection period, then delivers the BINSR. The seller has 5 days to respond, and the buyer then has 5 days to decide whether to proceed. Our 36-hour quote is built to fit inside that 5-day seller window.

Do I need a licensed contractor for BINSR repairs?

A licensed contractor provides state licensing accountability. Our work is coordinated under an Arizona ROC license, with documentation prepared for transaction review; acceptance depends on the transaction parties and specific job.

Send us the BINSR. We'll take it from here.

Free, complete quote with a 36-calendar-hour target. Every trade. Pay at close.

Prefer to upload? Send your BINSR through our quick upload form and get a complete, itemized quote with a 36-calendar-hour target.

📞 Call Get a Quote